WHY RENALDO

Because a building project
belongs together.

RENALDO brings predefined work items, prices, durations and quantity rules for residential construction. Your building data becomes a prepared starting point: review, refine and reuse it for estimating, tendering and scheduling. Less manual preparation and data transfer, for new builds and renovation.
RenaldoWorkspace / Portfolio cockpitJL
RENALDO HOUSING

Portfolio cockpit

↗
Projects12
Homes248
Budget38,6 Mio. €
Park QuarterNew build · 48 homes
78%
Parkstraße 12Renovation · 64 homes
42%
Am LindenhofInfill · 24 homes
25%
✓ Costs and schedules. Project by project.
RENALDO · DESIGN CONCEPT · SAMPLE DATA
ONE DATA CORE. SEVEN MODULES.

The modules you need.
One connected system.

Start with the work you need and expand when required. Building quantities, services, prices and durations stay connected, from the first decision through construction.

01Site & Feasibility

Site & Feasibility

Evaluate potential before committing capital.

  • Site analysis and development potential
  • Cost and return scenarios
  • Sensitivity analysis and decision documents
Explore features ↗
02Plan & Calculate

Plan & Calculate

Turn building quantities into reliable decisions.

  • Building and room models with full IFC handover to your designer
  • Service selection, quantities and cost scenarios
  • Renovation concepts and advisory reports
  • Material article metadata and Excel/CSV library import
  • Planning Center with prepared plan sets and details; exports require project release
Explore features ↗
03Tender & Account

Tender & Account

From the service catalogue to the checked invoice.

  • Generate bills of quantities from checked quantities and selected services
  • Compare offers, award work and manage changes
  • Measurements, invoice checks and approvals
Explore features ↗
04Schedule & Quality

Schedule & Quality

Build a programme. Keep work moving.

  • Generate the construction schedule from quantities, durations and stored dependencies
  • Takt planning and 4D simulations
  • Order planning with working-day lead times and schedule markers
  • Site walks, progress, defects and response rules
Explore features ↗
05Portfolio & Strategy

Portfolio & Strategy

Evaluate your portfolio and plan investments over several years.

For housing companies · included in Housing

  • Stock analysis, potential and investment programmes
  • Climate pathways, lifecycle costs and embodied emissions
  • Housing Complete: tenant communication, technical operations and stock renovations without project fees
Explore features ↗
06Offers & Orders

Offers & Orders

Cost client tenders and present your offer through to acceptance.

For construction firms & general contractors

  • GAEB import, service matching and bid costing
  • Quantity checks, bid schedule and GAEB X84
  • 3D offer room with quantities, schedule and payment plan
  • Protected link, guided tour, online acceptance and read statistics
Explore features ↗
07Companies & Subcontractors

Companies & Subcontractors

All subcontractors and companies of your organisation in one place: certificates, company check, history, figures and ratings.

For all professional audiences; included in Housing Complete

  • Directory of every company from your projects
  • Required certificates with expiry reminders
  • Company check, history and performance figures
  • Ratings and block list
  • For contractors: packages from the client tender
Explore features ↗

Shared foundation: building data, documents and collaboration connect the modules. Invited participants collaborate for free within their project role; independent professional editing requires the appropriate modules. Collaboration is not an additional module.

AFTER CONSTRUCTION

Keep using project data for technical operations and marketing. Availability follows the respective offer.

Explore technical operations ↗
Compare modules & packages ↗
BUILT FOR YOUR WORK

Start prepared. Keep the work connected.

RENALDO prepares the starting point. Review, refine and work together. Building data, work items, prices and durations stay connected, for new builds and renovation.

WHAT MAKES RENALDO DIFFERENT

RENALDO prepares.
You review and deliver.

A shared building model gives you more than an overview: it forms the basis for calculations, tendering and construction schedules.

RenaldoILLUSTRATIVE VIEW
BUILDING / LAYOUT

One building. Connected spaces.

Building A
3 F2 F1 FGF4 floors · 8 apartments
Floors & apartmentsConnected room schedule

Available before an IFC import. Missing geometry remains identifiable as an assumption.

Schematic illustration · fictional sample project
01 / CONNECTED BY DESIGN

A building model you can work with

Understand floors, apartments and rooms in 2D and 3D. Edit building data and review derived quantities. The model connects the spatial view to estimating, specifications and the construction sequence.

See the building. Use its connections.Explore the building model ↗
RenaldoILLUSTRATION
01Building02Quantities03Costs
Windows24 units
Facade480 m²

✓ Derived from the building model

02 / CONNECTED BY DESIGN

Calculate without measuring twice

The building model and predefined work items immediately produce a line-item estimate for new builds and renovation. Review quantities, scope and prices, then reuse the same foundation for the bill of quantities.

Less copying. More time to plan.Explore the platform workflow ↗
RenaldoILLUSTRATION
01Configuration02Work items03Tender
Windows24 units
Facade480 m²

✓ Derived from the building model

03 / CONNECTED BY DESIGN

A specification you do not have to write again

Generate the specification from reviewed work items and quantities, invite suppliers and compare bids – with the Renaldo market price from real contractor prices as a benchmark, even before the first bid. Clarify missing items before awarding; keep the order and scope in the same project.

Keep planning and tendering connected.Explore the platform workflow ↗
RenaldoILLUSTRATION
01Specification02Bids03Missing items
Scope24 / 24
Bid A22 / 24

! Clarify 2 items before awarding

04 / CONNECTED BY DESIGN

A bid comparison that reveals the gaps

Renaldo compares bids against your specification and against the Renaldo market price for each item – real contractor prices, regionally adjusted. The benchmark is there before the first bid arrives, and missing items become visible before you award.

See the price. Understand the scope.Explore the platform workflow ↗
RenaldoILLUSTRATION
01Work items02Durations03Schedule
Structure
Windows
Fit-out
05 / CONNECTED BY DESIGN

A construction schedule that writes itself

Configured work items produce durations and workflows. Dependencies connect trades and carry schedule changes through the plan. Checkpoints follow tasks and takt areas.

Arrive on site with a prepared workflow.Explore the platform workflow ↗
RenaldoILLUSTRATIVE VIEW
202720282029
Portfolio → Programme → Projects
06 / CONNECTED BY DESIGN

A portfolio strategy that reaches the construction site

Prioritise buildings, plan annual budgets and cash needs, and turn measures into projects. Reviewed project costs and delivery results feed back into strategy revisions.

From potential to a deliverable programme.Explore portfolio strategy ↗
RenaldoILLUSTRATION
01Site02Potential03Feasibility
Maximum viable land price2,14 Mio. €
07 / CONNECTED BY DESIGN

Feasibility in three clicks

Evaluate vacant sites with predefined serial building concepts. Development potential, trade costs and revenue assumptions feed into one viability calculation, through to the maximum viable land price.

Know earlier whether a project adds up.Explore the platform workflow ↗
RenaldoILLUSTRATION
01Capacity02Takt03Duration
Structure
Windows
Fit-out
08 / CONNECTED BY DESIGN

A takt simulation that shows where capacity saves time

Explore crew capacity and takt to see where additional teams save time. Then follow the saved sequence across floors, apartments and rooms in the 4D view, using the schematic model or imported IFC geometry.

Shape the construction duration, not just the dates.Explore the platform workflow ↗
RenaldoSample data
ElectricalOverpayment risk
Order incl. approved variations100.000 €
Construction progress 20 %
Billing progress 70 %

50 percentage points ahead: billing is substantially ahead of construction.

09 / CONNECTED BY DESIGN

Billing that keeps track of construction progress

Orders, approved variations, progress and invoices come together. Before approval, Renaldo highlights billing that is ahead of construction and issues that need clarification.

Spot overpayment risks. Approve with context.Explore the platform workflow ↗
RenaldoIllustrative view
NT 02 · ElectricalOffer received
Quantity changedSockets12 → 18
NewData connection4
RemovedWall light2 → 0
Proposed additional cost1.480 €
Additional duration2 days

Not yet commissioned. Only approval increases the order value.

10 / CONNECTED BY DESIGN

A variation that connects cost and construction time

Compare item-level changes with the awarded scope, request contractor prices and approve with context. Approved additional work increases the order value; additional duration can be added as a schedule task.

Agree changes before they are invoiced.Explore the platform workflow ↗
MORE CAPABILITIES

More for your
next construction project.

These capabilities complement the ten highlights, from serial construction concepts to the right renovation pathway.

11

Evaluate serial construction concepts

Evaluate pre-designed apartment-building concepts from the GdW framework for your site, including provider, energy standard and feasibility to support the next decision.

Site · Building concept · Provider enquiry
Explore this capability in context ↗
12

Optimise your budget

Set a target budget and compare calculated adjustments. Alternative specifications and scope changes show their amounts, energy impact and dependent work items.

Target budget · Options · Feasible scope
Explore this capability in context ↗
13

From energy performance to a costed renovation

Review portfolio efficiency classes and CO₂, distinguish certificate data from estimates and calculate renovation potential. Export PDF or CSV findings and turn selected properties into costed projects. The Renaldo renovation roadmap turns the selected cost option into a sequence of measures, also as a branded PDF, explicitly not an iSFP.

Current condition · Measures · Cost and impact
Explore this capability in context ↗
14

AI for bids, invoices and questions

Analyse bids, review invoices and ask SAM questions. AI helps identify issues and prepares information to support your decisions.

Bid analysis · Invoice review · SAM
Explore this capability in context ↗
MAKE INFORMED DECISIONS

Know the costs.
And their reliability.

Work item × quantity × unit price: Renaldo connects building and room data with regional trade prices. The cost-confidence indicator shows how reliable your calculation is and which details are missing for the next level of accuracy.

A figure to inform your decision, with a visible assessment of the calculation.
DELIVER TOGETHER

One project view.
For everyone building together.

Developers, site managers, designers and trades work on the same project. Information and updates stay connected to it. In the site portal, trades see their tasks and report progress or delays through a link, without needing to create an account.

From the office to the site. With updates flowing back.
BUILT FROM CONSTRUCTION EXPERIENCE

Prepare well.
Build with the right rhythm.

Gregor Loukidis and Ronald Meyer combine platform development with experience in serial renovation, construction logistics and the Sanierungssprint. That combination shapes Renaldo, from early calculations to delivery on site.

The Sanierungssprint brings preparation, construction logistics and coordinated scheduling together. Our renovation-coach training passes on this knowledge to help homeowners and professionals move projects forward on site.

Explore renovation-coach training (German) ↗
Meet the people behind Renaldo ↗

Start with your own building and an initial cost estimate.

Start for free
RENALDO PLANNING CENTER

Start planning from a prepared building model.

Use preliminary calculations and draft plans as a shared starting point. Review assumptions with specialists and reuse checked quantities and selected work items for costs, procurement and scheduling.

RENALDO PLANNING CENTERIllustrative view
Building model

Rooms · Components · Quantities · Assumptions

Plans & preliminary sizingReview & refineCosts · BoQ · Schedule
A shared starting point. Professional review turns prepared values into your project baseline.
CONNECT EARLY DESIGN AND PROFESSIONAL PLANNING

Your designer starts with a model.

A prepared starting point reduces repeated data entry, especially in renovation. RENALDO connects the building model, room schedule and draft drawings. Your designer receives the model via IFC, reviews it and develops the architectural design and subsequent planning.

  1. Start with the existing building

    Available LOD2 building data and a hypothetical room schedule provide an initial model. Existing drawings, surveys, scans or IFC data refine that starting point.

  2. Hand over the full model

    IFC4 export includes the components present in the model: walls, slabs, roof, stairs, windows and doors, plus spaces, quantities, materials and properties. Draft drawings from the Planning Center support the handover.

  3. Review and develop the design

    The designer checks dimensions and existing conditions, adds a measured survey where needed and makes the final architectural adjustments. Professional planning builds on the early design.

LOD2 and a hypothetical room schedule are early design assumptions, not a measured survey. Spaces without a known location remain records without invented geometry. The designer checks import and editability in the chosen CAD system and remains responsible for professional review and approval.

Module: Plan & Calculate. File handover follows the project release rules for plans and data exports; a trial alone does not unlock IFC downloads. Housing and homeowner project and package rules apply.

HOUSING · PORTFOLIO & STRATEGY

Compare climate targets and costs over time.

Which package suits the building and meets the climate target? Compare its carbon trajectory with the selected target pathway, identify gaps and prioritise portfolio investments.

Lifecycle costs beyond construction

Assess construction and measure costs for materials and labour, maintenance, replacement and residual value alongside energy and carbon costs. Adjust horizon and discount rate, compare present value and annual costs, and assess carbon abatement costs.

Operational and embodied emissions

Reviewed component quantities add embodied emissions in the project. Sources, measured data and estimates remain traceable. The public demo shows climate pathways and simplified cost analysis; it does not replace a verified building lifecycle assessment.

Included in Housing Portfolio and Housing Komplett. Housing Komplett adds procurement, scheduling and renovation-related resident communication. Operate alone does not include portfolio strategy.

CONTRACTORS · WORK PREPARATION

From material item to timely ordering.

Reuse your article library

Maintain article number, manufacturer, supplier, unit and price for materials. Import Excel and CSV lists into your library with column mapping and preview. Material data stays connected to line items and work preparation.

Include lead times in the schedule

Set lead times in working days for materials, line items, trades and company defaults. Order planning shows sampling, release and latest ordering dates before installation. Changes to source data flag existing orders for review.

Plan & Calculate covers material items and library import; Schedule & Quality covers order planning. The contractor package also includes bid costing, the 3D offer room and subcontractor management. Packages from the client tender require Bid costing and Tender & Account.

See what RENALDO can do for your own project.

Start for free
THE OPERATING SYSTEM FOR RESIDENTIAL CONSTRUCTION

Your next project.
With a clear plan.