Site & Feasibility
Evaluate potential before committing capital.
- Site analysis and development potential
- Cost and return scenarios
- Sensitivity analysis and decision documents

Start with the modules you need and expand when required. Renaldo calculates and generates plans, costs, bills of quantities and schedules from the building model in a few clicks. Review the results and carry them into your work.
Evaluate potential before committing capital.
Generate plans and cost calculations from your building model.
From the service catalogue to the checked invoice.
Build a programme. Keep work moving.
Evaluate your portfolio and plan investments over several years.
For housing companies · included in Housing
All subcontractors and companies of your organisation in one place: certificates, company check, history, figures and ratings.
For all professional audiences; included in Housing Complete
Shared foundation: building data, documents and collaboration connect the modules. Invited participants collaborate for free within their project role; independent professional editing requires the appropriate modules. Collaboration is not an additional module.
Keep using project data for technical operations and marketing. Availability follows the respective offer.
Explore technical operations ↗Renaldo automatically calculates and generates plans, costs, bills of quantities and schedules from the building model and selected work items. Review, refine and work together, for new builds and renovation.
Import portfolio data and compare climate pathways and lifecycle costs. Prioritise measures against targets and budgets, then develop them as projects.
See the workflow ↘02Use the model and room schedule for quantities and costs. Hand over all modelled components to your designer via IFC, starting from LOD2 and a hypothetical room schedule.
See the workflow ↘03Generate draft plans and preliminary calculations from the building model at the click of a button. Review with specialists, refine and reuse for costs, procurement and delivery.
See the workflow ↘04Building data and predefined work items produce the estimate. Review quantities and scope, then reuse the same basis for tendering.
See the workflow ↘05Generate the specification, invite suppliers and compare price and completeness – against the Renaldo market price per item, even before the first bid.
See the workflow ↘06Quantity-based durations and predefined dependencies generate the sequence. Adapt takt and capacity to the project.
See the workflow ↘07Evaluate vacant sites with predefined serial building concepts. Assess construction costs, revenue and land price together.
See the workflow ↘Explore floors, apartments and rooms in 2D and 3D. A schematic view emerges from the building definition, connected to the room schedule, quantities and costs.
Rotate the building, reveal interiors and select floors or apartments. Derived dimensions remain identifiable as assumptions; the schematic view is not a measured floor plan.
Imported IFC rooms and elements add detail. In the construction schedule, view the sequence on the schematic building or imported geometry.
Available before an IFC import. Missing geometry remains identifiable as an assumption.
See what RENALDO can do for your own project.
Start for freeMove selected properties into projects and refine quantities, work items and prices. Turn the initial assessment into a traceable basis for your construction project.
Costing and renovation calculations use project building data. Additional inputs refine the basis for decisions.
The analysis shows where building pays off. The costing runs on real contractor prices. And the tender grows out of the same data – nothing re-entered.
Costing and renovation calculations use project building data. Additional inputs refine the basis for decisions.
The analysis shows where building pays off. The costing runs on real contractor prices. And the tender grows out of the same data – nothing re-entered.
Quantities from the building, prices from the market.
You pick the work. The quantity comes from the building and room data, the price from real regional contractor rates. No counting windows, no measuring wall areas.
Review efficiency classes, final energy and CO₂ across the portfolio. Calculated renovation options show the potential impact of a package of measures.
Import energy certificates with energy metrics, CO₂ values, certificate type and expiry date. Available certificate values take precedence over model values; estimates and sources stay visible.
Each figure identifies whether it comes from a certificate, your input or area data. Missing inputs are not replaced with invented values.
Calculated potential · Input-data sources remain visible.
Import energy certificates with energy metrics, CO₂ values, certificate type and expiry date. Available certificate values take precedence over model values; estimates and sources stay visible.
Each figure identifies whether it comes from a certificate, your input or area data. Missing inputs are not replaced with invented values.
Compare efficiency classes, assessed floor area and CO₂ before and after renovation. Properties in classes F to H support your construction and renovation planning.
Export top opportunities as PDF, the complete list as CSV and a project ESG report. Assumptions accompany exports; these do not replace energy certificates, statutory energy evidence or taxonomy assessments.
The pre-designed apartment-block concepts of the GdW framework agreement on serial construction, matched automatically to your plots – all the way to the supplier enquiry and a pre-configured bill of quantities.
The suitability check scores every existing building against the criteria of serial retrofitting – building type, residential units, construction era – and shows honestly what speaks for or against factory prefabrication, including a cost anchor per m² of living space. Out of your stock grows the longlist for the next retrofit programme.
Start with suitable modules: Plan & Calculate from €149 net/month; all four project modules in Project Package for €399, or Project Package Team with five internal users for €990. Per project: concept included, unlock plans from €290 (renovation) or €490 (new build), move into delivery from €990 (renovation) or €1,490 (new build) including 5 units. Housing Complete stock renovations are included. Existing terms remain unchanged.
See what RENALDO can do for your own project.
Start for freeCurrent condition, target and measures in one clear result. The Renaldo renovation roadmap follows your selected cost-planning option, from the building envelope and heating to power and storage.
Supporting trades included once. Not an iSFP.
Metrics and measures are reconciled with your selected work items. Supporting trades appear once, while external work remains separately identified.
Export a PDF with the logo and address from your branding profile alongside Renaldo. The Renaldo renovation roadmap is explicitly not an individual renovation roadmap (iSFP).
Explore the tools and workflows that support your next project.
Drawings, certificates, contracts and correspondence audit-proof per property – shareable with banks and committees.
Drawings, certificates, contracts and correspondence audit-proof per property – shareable with banks and committees.
See what RENALDO can do for your own project.
Start for freeTurn a prioritised property into a fully costed project. Housing companies start with the rental view and assess the viability of construction concepts.
Review net rent, annual rent, property value and rental yield together. Modernisation rent adjustments and caps are included in the calculation.
See the required net rent and calculate blended rent for subsidised shares. You enter the specific approved subsidised rent.
From the selected property to project costing.
Review net rent, annual rent, property value and rental yield together. Modernisation rent adjustments and caps are included in the calculation.
See the required net rent and calculate blended rent for subsidised shares. You enter the specific approved subsidised rent.
Cost. Plan. Build. For the whole stock – from one data core.
60 days free · no credit card · GDPR-compliant, servers and database in Germany, files in the EU
Built by practitioners: 10 years of retrofit project management + 30+ years of construction expertise.
In the browser, on iOS and Android – the same project status everywhere.
Every address checked automatically: how much building right is unused, which property suits serial retrofit, which concept fits – as a ranked list of opportunities instead of a hundred individual surveys.
Viability from net rent × multiple instead of sale prices – including the Section 559 modernisation levy with its caps, plus funding. The view a housing company actually decides in.
Address list in, opportunity list out.
Import your stock as text or CSV — every property is enriched with cadastral parcel, planning law and standard land value from official sources and ranked by potential: densification, serial retrofit, concept fit.
Straight from the configuration into the tender.
The configuration produces a tender-ready bill of quantities across all trades — with full item texts, quantities and unit prices. For serial concepts, pre-configured in system construction.
Paste an address list or upload a CSV – Renaldo enriches every property with official data (cadastral parcel, site-coverage and floor-area ratios, standard land value, existing built volume) and scores three opportunities: densification (unused building right with a unit estimate), serial retrofit and concept fit. As a ranked list and on the map – and any opportunity becomes a project with one click.
Renaldo knows the concepts of the GdW framework agreement on serial construction and checks them against the development potential of your plot – with supplier, construction method, energy standard, CO₂ figure, number of flats and the margin when buying at the standard land value. Adopt a matching concept directly as a project: building structure and bill of quantities are pre-configured in system construction, and you contact the supplier with a ready-to-send letter.
Acquisition check or project costing: Renaldo can run the numbers in the letting view – capitalised value from net rent × multiple, supportable land price including purchase costs, and for modernisations the maximum Section 559 levy with its caps, funding and value uplift. For housing companies the rent view is the default, not a detour.
Expert questions on German building-energy law, funding, modernisation and standards – in the context of the property at hand.
Technical staff, portfolio management, executives and external planners in the same organisation – no per-seat surcharge.
Match and plan KfW/BAFA programmes for new build, modernisation and energy retrofit.
Bill of quantities with full item texts per trade, radius search and online enquiries to firms – bids come back comparable.
Reports, memos and exposés in your company’s layout – for board, supervisory committee and banks.
From analysing your stock and plots through costing, tendering and construction into operation. And the cycle closes: operation feeds the next modernisation – on the same data.
Costing across all trades – with pre-built bills of quantities and real contractor prices. Every work item linked directly to the building and room data.
Housing Start is free. The whole portfolio uses a monthly organisation licence including 1,000 licensed stock units and unlimited internal users. Further units at marginal rates: up to 5,000 at €0.80, up to 20,000 at €0.50, up to 50,000 at €0.30, above that €0.15 per month. Twelve-month minimum term from the first invoice.
A prepared starting point reduces repeated data entry, especially in renovation. RENALDO generates draft drawings from the building model and room schedule at the click of a button. Your designer receives the model via IFC, reviews it and develops the architectural design and subsequent planning.
Available LOD2 building data and a hypothetical room schedule provide an initial model. Existing drawings, surveys, scans or IFC data refine that starting point.
IFC4 export includes the components present in the model: walls, slabs, roof, stairs, windows and doors, plus spaces, quantities, materials and properties. Draft drawings from the Planning Center support the handover.
The designer checks dimensions and existing conditions, adds a measured survey where needed and makes the final architectural adjustments. Professional planning builds on the early design.
LOD2 and a hypothetical room schedule are early design assumptions, not a measured survey. Spaces without a known location remain records without invented geometry. The designer checks import and editability in the chosen CAD system and remains responsible for professional review and approval.
Module: Plan & Calculate. File handover follows the project release rules for plans and data exports; a trial alone does not unlock IFC downloads. Housing and homeowner project and package rules apply.
What changed since the contract was awarded? Renaldo connects items, quantities and the contractor’s offer to your decision. Open proposals and approved additional costs remain separate.
Approval commissions the variation and requires a price. Only approved variations increase the order value. Additional time can be added as a separate schedule task, which also contributes to the progress comparison.
See what RENALDO can do for your own project.
Start for freeDoes billing match construction progress? Renaldo connects orders, variations, progress and invoices to highlight overpayment risks before approval.
The decision remains yours. Warnings do not block payment.
50 percentage points ahead: billing is substantially ahead of construction.
Construction progress from status updates, weighted by working days. No automatic payment.
The accepted order plus approved variations form the order value. Invoices are linked to orders; you resolve ambiguous cases.
Open defects, payment-related checkpoints and overruns are highlighted, as are final invoices before acceptance and variation invoices without an approved variation. Approval despite warnings requires a reason. Approval and recording payments require a separate permission.
Record payment dates, discounts and retention. Discount and due-date reminders support processing. Transfers are still made through your bank.
Ask homeowners in the project team to pay after approval and send reminders when needed. The last dispatch remains visible. Saved invoices can also be analysed with SAM later.
The traffic light compares billing with reported construction progress, not workmanship quality. Completion reports without acceptance are shown separately. Grey means the order or construction schedule is missing.
Explore renovation and new construction in their spatial context. The 4D view maps saved schedule dates to floors, apartments and rooms, using a schematic model or imported IFC geometry.
Sample fit-out trade. Colours show planned dates, not confirmed completion.
Checkpoints follow tasks and takt areas. Due checks and reminders remain connected to the construction schedule.
Document readiness, obstacles and completion during site walks. These reports complement the plan and feed into the delivery overview.
Paste addresses or import a CSV. Renaldo adds available official site and building data to help identify opportunities for new construction, infill and renovation.
Add floor area, energy figures and heating data when available. Enrichment continues in the background after you close the browser.
Balanced, growth or climate pathway: three profiles weight construction opportunities and energy need. Rankings show their components and give estimates less weight.
Add floor area, energy figures and heating data when available. Enrichment continues in the background after you close the browser.
Balanced, growth or climate pathway: three profiles weight construction opportunities and energy need. Rankings show their components and give estimates less weight.
Official data availability varies by region. Area-level construction age and heating data are labelled. Potential estimates do not replace checks of building envelopes, setbacks and access.
Refresh individual property analyses when new inputs are available. Data enrichment runs in the background while you continue working.
Type an address – Renaldo loads the cadastral parcel, planning law and standard land value from official sources and shows the supportable land price at your target margin, including purchase costs. The densification map colours the neighbouring parcels by unused building right, and the result goes straight to board or supervisory committee as an acquisition memo PDF.
See what RENALDO can do for your own project.
Start for freeWhich buildings first? Which measures fit the budget? Import existing portfolio data or start with an address list. RENALDO adds available public building data. Review the starting point, compare renovation strategies and plan investment across multiple years, with reserves, available capacity and a clear path into delivery.
Climate pathways and lifecycle costs in detail ↘One building per year. Review budget and capacity together.
Review climate pathways and target gaps. Compare construction and measure costs with ongoing energy, maintenance and carbon costs across the lifecycle, including replacement and residual value. Set a target energy class or package of measures, annual budgets and capacity. Compare Balanced, Worst First and carbon impact per euro. Review monthly cash needs, funding assumptions and uncovered financing gaps.
Carry building data, selected measures and cost assumptions into project preparation. Your team and appointed specialists review and refine the basis for cost planning, tendering and delivery. Assumptions remain traceable as assigned verification tasks with evidence.
Review dates, orders, variations and invoice status from linked projects together. Record measured before-and-after figures with their sources. Preserve the decision baseline and use new findings in subsequent revisions. Share decision reports as PDF and CSV.
Which package suits the building and meets the climate target? Compare its carbon trajectory with the selected target pathway, identify gaps and prioritise portfolio investments.
Assess construction and measure costs for materials and labour, maintenance, replacement and residual value alongside energy and carbon costs. Adjust horizon and discount rate, compare present value and annual costs, and assess carbon abatement costs.
Reviewed component quantities add embodied emissions in the project. Sources, measured data and estimates remain traceable. The public demo shows climate pathways and simplified cost analysis; it does not replace a verified building lifecycle assessment.
Included in Housing Portfolio and Housing Komplett. Housing Komplett adds procurement, scheduling and renovation-related resident communication. Operate alone does not include portfolio strategy.
Start of work, apartment access or a changed date: prepare relevant notices from the construction project. Review the affected households and approve communication without requiring residents to have an app account.
Building A · Apartments 01–04
Proposed date: 14 June
Bring costs, schedules and your project team together.
Start for freeConnect the office with the project on site. Keep your construction and renovation projects in view wherever you work.
Or get started in your browser ↗08:00 — 16:00 · 2. OG
68 %