Site & Feasibility
Evaluate potential before committing capital.
- Site analysis and development potential
- Cost and return scenarios
- Sensitivity analysis and decision documents
Start with the work you need and expand when required. Building quantities, services, prices and durations stay connected, from the first decision through construction.
Evaluate potential before committing capital.
Turn building quantities into reliable decisions.
From the service catalogue to the checked invoice.
Build a programme. Keep work moving.
Evaluate your portfolio and plan investments over several years.
For housing companies · included in Housing
Cost client tenders and present your offer through to acceptance.
For construction firms & general contractors
All subcontractors and companies of your organisation in one place: certificates, company check, history, figures and ratings.
For all professional audiences; included in Housing Complete
Shared foundation: building data, documents and collaboration connect the modules. Invited participants collaborate for free within their project role; independent professional editing requires the appropriate modules. Collaboration is not an additional module.
Keep using project data for technical operations and marketing. Availability follows the respective offer.
Explore technical operations ↗The complete feature overview: from portfolio and early design through costs and procurement to delivery. Module groups also cover bid costing, the 3D offer room and subcontractor management. Choose a topic for your role; each module explains its scope and availability.
What makes Renaldo different ↗Use the model and room schedule for quantities and costs. Hand over all modelled components to your designer via IFC, starting from LOD2 and a hypothetical room schedule.
See the workflow ↘02Use building models, preliminary calculations and draft plans as a shared starting point. Review with specialists, refine and reuse for costs, procurement and delivery.
See the workflow ↘03Building data and predefined work items produce the estimate. Review quantities and scope, then reuse the same basis for tendering.
See the workflow ↘04Generate the specification, invite suppliers and compare price and completeness – against the Renaldo market price per item, even before the first bid.
See the workflow ↘05Quantity-based durations and predefined dependencies generate the sequence. Adapt takt and capacity to the project.
See the workflow ↘06Import portfolio data and compare climate pathways and lifecycle costs. Prioritise measures against targets and budgets, then develop them as projects.
See the workflow ↘07Evaluate vacant sites with predefined serial building concepts. Assess construction costs, revenue and land price together.
See the workflow ↘A shared building model gives you more than an overview: it forms the basis for calculations, tendering and construction schedules.
Evaluate vacant sites with predefined serial building concepts. Development potential, trade costs and revenue assumptions feed into one viability calculation, through to the maximum viable land price.
Know earlier whether a project adds up.✓ Derived from the building model
Generate the specification from reviewed work items and quantities, invite suppliers and compare bids – with the Renaldo market price from real contractor prices as a benchmark, even before the first bid. Clarify missing items before awarding; keep the order and scope in the same project.
Keep planning and tendering connected.Configured work items produce durations and workflows. Dependencies connect trades and carry schedule changes through the plan. Checkpoints follow tasks and takt areas.
Arrive on site with a prepared workflow.See what RENALDO can do for your own project.
Start for freeIs this project viable? Connect the site, building and financial assessment before acquisition or further planning. Turn a new-build idea into a calculation you can trace.
Review the land value, plot and development potential together. Floor-area ratio, site coverage and floor count inform possible areas and apartment numbers as a basis for further assessment.
Trade costs feed into the margin, residual value and maximum land price. Switch between sale and rental scenarios and compare options before committing.
Assess vacant areas, infill opportunities and independent new-build schemes alongside your existing stock. Compare concepts and costs before developing the project.
Reuse reviewed building quantities for costing, tendering and scheduling. Planning permissions and actual development potential require project-specific review.
See what RENALDO can do for your own project.
Start for freeExplore floors, apartments and rooms in 2D and 3D. A schematic view emerges from the building definition, connected to the room schedule, quantities and costs.
Rotate the building, reveal interiors and select floors or apartments. Derived dimensions remain identifiable as assumptions; the schematic view is not a measured floor plan.
Imported IFC rooms and elements add detail. In the construction schedule, view the sequence on the schematic building or imported geometry.
Available before an IFC import. Missing geometry remains identifiable as an assumption.
Automatically as maximum massing, manually, or via IFC import.
Explore the tools and workflows that support your next project.
Capture the existing building, cost it with real contractor prices, and secure funding.
Quantities from the building, prices from the market.
Capture the existing building, cost it with real contractor prices, and secure funding.
Quantities from the building, prices from the market.
Real amounts – and the feasible scope when the target falls short.
Adjust the works configuration in a few steps and turn existing data into reliable cost estimates fast: from an individual retrofit roadmap (iSFP), via the retrofit calculator with measures proposed from the existing building, through AI damage analysis, or by importing reports and free text (particularly useful for building professionals).
Place a defect, checkpoint or diary entry on a PDF plan. Each pin belongs to a particular plan version and page and opens its linked record.
Record participants and outcomes in the site diary, send minutes as PDF to participants and look up recorded project events in the event log.
See what RENALDO can do for your own project.
Start for freeReview efficiency classes, final energy and CO₂ across the portfolio. Calculated renovation options show the potential impact of a package of measures.
Import energy certificates with energy metrics, CO₂ values, certificate type and expiry date. Available certificate values take precedence over model values; estimates and sources stay visible.
Each figure identifies whether it comes from a certificate, your input or area data. Missing inputs are not replaced with invented values.
Calculated potential · Input-data sources remain visible.
Import energy certificates with energy metrics, CO₂ values, certificate type and expiry date. Available certificate values take precedence over model values; estimates and sources stay visible.
Each figure identifies whether it comes from a certificate, your input or area data. Missing inputs are not replaced with invented values.
Compare efficiency classes, assessed floor area and CO₂ before and after renovation. Properties in classes F to H support your construction and renovation planning.
Export top opportunities as PDF, the complete list as CSV and a project ESG report. Assumptions accompany exports; these do not replace energy certificates, statutory energy evidence or taxonomy assessments.
Rating, measure, new class.
Energy-rated and ready to report.
Current condition, target and measures in one clear result. The Renaldo renovation roadmap follows your selected cost-planning option, from the building envelope and heating to power and storage.
Supporting trades included once. Not an iSFP.
Metrics and measures are reconciled with your selected work items. Supporting trades appear once, while external work remains separately identified.
Export a PDF with the logo and address from your branding profile alongside Renaldo. The Renaldo renovation roadmap is explicitly not an individual renovation roadmap (iSFP).
Explore the tools and workflows that support your next project.
Find the right firms, put the works out to tender, and compare bids safely with AI.
Construction, quality and invoices under control – safely to the final invoice.
Find the right firms, put the works out to tender, and compare bids safely with AI.
Construction, quality and invoices under control – safely to the final invoice.
Brochure, data room and listing – out of the same project data.
Tenants, maintenance, running costs and ESG on the same asset data.
All ten come out of one configuration. That is why costs, dates and the tender always agree — and why Renaldo can also see what is missing.
Address list in — densification, serial retrofit and concept fit per property.
Straight from the configuration into the tender.
And when extra capacity stops helping.
Official data for the address, no add-on services.
From trade down to individual line item – works on five levels, drawn from 20 trades plus design and project support. Automatically linked to the building data. With suggestions, alternatives shown explicitly and dependencies checked automatically – meaning clear packages for clients and less back-and-forth for professionals. When a project involves many trades or a large volume, Renaldo automatically suggests matching design and support services in the basket.
The “Energy advice” page brings together everything you need to know about your retrofit, matched to your building data: a GEG check against German building-energy law (U-values, efficiency-house levels), a funding check covering BAFA, KfW, federal-state and municipal schemes, and a recommendation of measures. Renaldo checks which programmes apply and keeps an eye on the deadlines for you.
Compare contractors by rating, capacity and price level – and request bids that match your works exactly, in one click.
Analyse bids one by one or side by side – Renaldo shows missing items, unusual prices, risky clauses and differing specifications at a glance.
Professionals produce a complete proposal per project, contract terms included – built from Renaldo service modules or on the German HOAI fee scale, with prices pre-filled and a payment schedule. Via the basket, those costs land straight in the client's budget. The client sees the proposal through an email link without logging in, and awards the work online.
Document defects with a photo and a location – structured, from site visit through to handover. Nothing gets lost in a chat thread: every item has a status, an image and a trade.
Upload invoices or let the contractor submit them through the order portal. Project management starts the AI review against the specification and commissioned bid.
Keep the phases, tasks and milestones of your project under control at all times. Tasks are a two-level checklist, and every phase has its own detail page with thematic icons and an integrated drawing register.
The project produces brochures per residential unit, a shareable data room for buyers and lenders, and the listing export – including an asking price pre-filled automatically from the feasibility appraisal, the rent roll and the standard land value. Nothing has to be assembled again from scratch.
Per residential unit, with AI-written marketing copy.
Maintain and export your marketing data.
The figures the bank and the buyer need.
After construction it carries on: tenancies, maintenance and ESG all run on the same asset data – from a single apartment block up to a whole portfolio, every residential unit with its own record.
A rent roll per unit, with no side spreadsheet.
Due dates under control, costs allocated.
From acquisition and development potential through costing, tendering and construction to operation and sale. New build and retrofit, from single-family homes to apartment blocks – every work item linked directly to the building and room data.
Costing across every trade – with ready-made bills of quantities and real contractor prices. Every work item linked directly to the building & room data.
See what RENALDO can do for your own project.
Start for freeFrom initial scenarios to supporting evidence: connect funding plans, offers and invoices to your construction project. Prepare the information needed for professional review and funding decisions.
Calculate funding options from the project and its measures, refine assumptions and adopt a scenario. Reconcile the selected funding approach with the cost plan.
AI-assisted checks examine offers and invoices for funding-relevant information. Missing evidence and technical questions are highlighted for further review.
Applications, documents, deadlines and reminders stay with the project. Keep track of missing evidence and the next action.
Review assumptions · Add documents · Track deadlines
Clients, planners and contractors collaborate within their assigned project permissions. Keep tasks, documents and decisions linked to the work.
An invitation grants the agreed project access. Independent professional editing requires the appropriate licence and role.
See what RENALDO can do for your own project.
Start for freeA prepared starting point reduces repeated data entry, especially in renovation. RENALDO connects the building model, room schedule and draft drawings. Your designer receives the model via IFC, reviews it and develops the architectural design and subsequent planning.
Available LOD2 building data and a hypothetical room schedule provide an initial model. Existing drawings, surveys, scans or IFC data refine that starting point.
IFC4 export includes the components present in the model: walls, slabs, roof, stairs, windows and doors, plus spaces, quantities, materials and properties. Draft drawings from the Planning Center support the handover.
The designer checks dimensions and existing conditions, adds a measured survey where needed and makes the final architectural adjustments. Professional planning builds on the early design.
LOD2 and a hypothetical room schedule are early design assumptions, not a measured survey. Spaces without a known location remain records without invented geometry. The designer checks import and editability in the chosen CAD system and remains responsible for professional review and approval.
Module: Plan & Calculate. File handover follows the project release rules for plans and data exports; a trial alone does not unlock IFC downloads. Housing and homeowner project and package rules apply.
Explore the tools and workflows that support your next project.
Every bid measured against your own bill of quantities.
Every bid measured against your own bill of quantities.
Professional clients choose a BGB or VOB/B template, review prefilled project data and add agreements. The specification and schedule can be attached.
The contractor reads and downloads the contract in the portal and explicitly accepts it. Contract status and the acceptance record stay with the order.
Connect quantities, work items and your next tender.
Start for freeWhat changed since the contract was awarded? Renaldo connects items, quantities and the contractor’s offer to your decision. Open proposals and approved additional costs remain separate.
Not yet commissioned. Only approval increases the order value.
The awarded specification stays with the order as a snapshot. Select new, removed or changed items individually for a variation.
Contractors price requested variations in the portal or submit items and lump sums themselves. When importing a PDF offer, Renaldo flags overlap with awarded work for review as additional quantity or duplicate billing.
Approval commissions the variation and requires a price. Only approved variations increase the order value. Additional time can be added as a separate schedule task, which also contributes to the progress comparison.
Does billing match construction progress? Renaldo connects orders, variations, progress and invoices to highlight overpayment risks before approval.
The decision remains yours. Warnings do not block payment.
50 percentage points ahead: billing is substantially ahead of construction.
Construction progress from status updates, weighted by working days. No automatic payment.
The accepted order plus approved variations form the order value. Invoices are linked to orders; you resolve ambiguous cases.
Open defects, payment-related checkpoints and overruns are highlighted, as are final invoices before acceptance and variation invoices without an approved variation. Approval despite warnings requires a reason. Approval and recording payments require a separate permission.
Record payment dates, discounts and retention. Discount and due-date reminders support processing. Transfers are still made through your bank.
Ask homeowners in the project team to pay after approval and send reminders when needed. The last dispatch remains visible. Saved invoices can also be analysed with SAM later.
The traffic light compares billing with reported construction progress, not workmanship quality. Completion reports without acceptance are shown separately. Grey means the order or construction schedule is missing.
Contractors submit invoices within the assigned order context. Clients and appointed professionals review services, quantities and changes against the project baseline.
Keep supporting documents, queries and approvals together. Commercial checks and payment decisions remain with the responsible parties.
See what RENALDO can do for your own project.
Start for freeGenerate the schedule from work items. Explore takt alternatives to shape the sequence and see saved dates mapped to floors, apartments and rooms in the 4D view.
Select a date, play the sequence and isolate trades. Switch between the schematic view and imported IFC geometry. Unresolved mappings remain visible.
Compare takt alternatives, follow task-linked checkpoints and record readiness and progress during site walks. 4D colours represent the plan; site reports document actual progress.
Sample fit-out trade. Colours show planned dates, not confirmed completion.
Schedule markers, a due-check view and reminders highlight upcoming inspections. Assign a checkpoint manually when needed.
Completion reporting uses the relevant step template. Area and task remain traceably linked.
And everyone involved keeps it current.
Check preceding work, materials at the workplace, access and crew availability during a guided site walk. “Resolve now” brings open decisions and obstacles together.
Compare observed duration and staffing with later sections. Review delivery windows and space after schedule changes; site management decides on adjustments.
Renaldo goes where your project takes you. With the iOS and Android app, project information is at hand for site managers, building experts and trades.
Or get started in your browser ↗08:00 — 16:00 · 2. OG
68 %A shared workflow reaches the contractor on site. The contractor account brings together orders, variations, enquiries and appointments; internal costing and approvals remain with project management.
Next: painter (from 18 Sep)
✓ On RenaldoPropose additional work as items or a lump sum and price requested variations directly. Each variation number belongs to its order. Project management commissions the work by approving it.
“Today” lists open items, and the schedule shows the following trade. Account notifications reach owners and site managers. The “On Renaldo” badge identifies a claimed account, not a quality certification.
From an accepted order through variations to invoices: contractors see their order and payment status in the portal and submit documents directly against the relevant record.
Submit PDFs and details directly against the order. Only your own order and invoice status are visible; internal calculations remain with project management.
Store certificates and insurance evidence for use across sites. Validity and expiry remain visible in the account and access-link portal.
Use the project baseline on site. SAM guides attendance, daily briefings and inspection points. Capture observations by voice, review entries and follow up open items.
Record progress, obstacles and defects against the construction sequence. Keep responsibilities and evidence together; professional assessment and approval remain with the appointed team.
08:00 — 16:00 · 2. OG
68 %See what RENALDO can do for your own project.
Start for freeMaintain article number, manufacturer, supplier, unit and price for materials. Import Excel and CSV lists into your library with column mapping and preview. Material data stays connected to line items and work preparation.
Set lead times in working days for materials, line items, trades and company defaults. Order planning shows sampling, release and latest ordering dates before installation. Changes to source data flag existing orders for review.
Plan & Calculate covers material items and library import; Schedule & Quality covers order planning. The contractor package also includes bid costing, the 3D offer room and subcontractor management. Packages from the client tender require Bid costing and Tender & Account.
Paste addresses or import a CSV. Renaldo adds available official site and building data to help identify opportunities for new construction, infill and renovation.
Add floor area, energy figures and heating data when available. Enrichment continues in the background after you close the browser.
Balanced, growth or climate pathway: three profiles weight construction opportunities and energy need. Rankings show their components and give estimates less weight.
Ranked by your priorities. With traceable data sources.
Add floor area, energy figures and heating data when available. Enrichment continues in the background after you close the browser.
Balanced, growth or climate pathway: three profiles weight construction opportunities and energy need. Rankings show their components and give estimates less weight.
Official data availability varies by region. Area-level construction age and heating data are labelled. Potential estimates do not replace checks of building envelopes, setbacks and access.
Refresh individual property analyses when new inputs are available. Data enrichment runs in the background while you continue working.
Free to start · 30/60 days of full features.
Plot, development potential and feasibility – before you buy.
The GdW concepts, checked automatically against planning law and margin.
All the way to the residual land value.
From plot to return in a single pass: official standard land value (BORIS), cadastral map and development potential, with automatic calculation of maximum gross floor area and residential units. Feasibility is calculated from real trade costs rather than lump sums – and shows the residual value, i.e. the maximum land price the scheme can carry.
Real costs instead of lump sums – for sale or for rent.
See what RENALDO can do for your own project.
Start for freeWhich buildings first? Which measures fit the budget? Import existing portfolio data or start with an address list. RENALDO adds available public building data. Review the starting point, compare renovation strategies and plan investment across multiple years, with reserves, available capacity and a clear path into delivery.
Climate pathways and lifecycle costs in detail ↘One building per year. Review budget and capacity together.
Review climate pathways and target gaps. Compare construction and measure costs with ongoing energy, maintenance and carbon costs across the lifecycle, including replacement and residual value. Set a target energy class or package of measures, annual budgets and capacity. Compare Balanced, Worst First and carbon impact per euro. Review monthly cash needs, funding assumptions and uncovered financing gaps.
Carry building data, selected measures and cost assumptions into project preparation. Your team and appointed specialists review and refine the basis for cost planning, tendering and delivery. Assumptions remain traceable as assigned verification tasks with evidence.
Review dates, orders, variations and invoice status from linked projects together. Record measured before-and-after figures with their sources. Preserve the decision baseline and use new findings in subsequent revisions. Share decision reports as PDF and CSV.
Which package suits the building and meets the climate target? Compare its carbon trajectory with the selected target pathway, identify gaps and prioritise portfolio investments.
Assess construction and measure costs for materials and labour, maintenance, replacement and residual value alongside energy and carbon costs. Adjust horizon and discount rate, compare present value and annual costs, and assess carbon abatement costs.
Reviewed component quantities add embodied emissions in the project. Sources, measured data and estimates remain traceable. The public demo shows climate pathways and simplified cost analysis; it does not replace a verified building lifecycle assessment.
Included in Housing Portfolio and Housing Komplett. Housing Komplett adds procurement, scheduling and renovation-related resident communication. Operate alone does not include portfolio strategy.
Bring stock analysis, selected measures and project delivery together. Your own team coordinates the work and appoints specialist planners and contractors where needed.
Define responsibilities, review cost assumptions and carry approved measures into projects. Specialist reviews and releases remain with the responsible professionals.
Option B is within budget. Please prepare the award.
Today, 09:42 · Building AExplore the next step for your residential portfolio.
Start for freeStart of work, apartment access or a changed date: prepare relevant notices from the construction project. Review the affected households and approve communication without requiring residents to have an app account.
Building A · Apartments 01–04
Proposed date: 14 June
Import the client’s GAEB tender, match every item to a Renaldo service and cost it with market prices, mark-up and contribution margin. Your bid goes back as GAEB X84 – in exactly the structure of the tender.
Bid as GAEB X84 – the same item numbers as the tender, including VAT and gross total.
GAEB DA XML 3.1 to 3.3 (X83, X81) with all titles, provisional, alternative, lump-sum and daywork items. Search by item number or text.
AI suggests a Renaldo service for every item, you confirm it. Confirmed matches are remembered for the next tender. Market price with regional factor as cost suggestion, mark-up per item or for the whole bill.
Quantities against the building model, missing scope as a hint for a bidder question – and a bid schedule with takt planning from the tender quantities.
GAEB X84 with the same IDs and item numbers, totals per title, VAT and gross total. The client’s tendering software reads it directly.
Instead of a PDF attachment, a protected link: your client sees their building in 3D, taps the roof, facade or heat pump and sees the related items, the schedule and the payment plan. A guided tour explains the offer step by step – and the order is placed online.
First opened on 2 Oct · scope 3× · schedule 2× – without IP address or device data.
Highlight components in the 3D model and show their items. For tenders in the client’s structure, with item numbers.
Takt-based bar chart from the quantities and instalments by construction progress. Link and PDF show the same version; a new version retires the old link.
Your client accepts the offer in the room. You see when it was opened and which sections were read. Purchase prices and margins never appear.
Connect quantities, work items and your next tender.
Start for freeEvery title of the tender becomes a subcontract package. Subcontractors price exactly the client’s items in the portal or download them as GAEB X83. The bid comparison shows what you keep, per item number.
Award with the package specification attached. Inviting bids carries no project fee – it is due with the first award.
Find suppliers, send invitations with preview, collect offers – with the tender’s item numbers, short and long texts. Requires bid costing and Tender & Bill, both included in the contractor package.
The comparison sets subcontractor offers against your bid to the client – per item number and as a package total. The benchmark exists before the first subcontractor bid: costed from the Renaldo market price, real contractor prices with a regional factor.
The award stores the package specification as the contract basis. Schedule, variations and invoice checks continue in the same project.
Every company from your projects with required certificates and expiry reminders, a company check via North Data and insolvency notices, figures such as award rate, variation rate and schedule reliability, and ratings after acceptance. Favourites and the block list apply to the whole organisation. This part can also be booked without the contractor package – by consultants, developers and housing companies.
Import floor plans, compare offers and work by voice or text. Discover how AI assists and where the platform uses defined calculations.
Option B is within budget. Please prepare the award.
Today, 09:42 · Building A