☰

Tender in.
Bid out.
Site under control.

Import the GAEB tender and match every item to your work-item database automatically – or build your own bid from building data when there is no tender. Submit as GAEB X84 and in the 3D offer room, compare subcontractors and run the site with schedule, order lead times and SAM site walks.
Review documents. Prepare bids. Plan delivery.49 seconds · no sound

From a verified bill of quantities to delivery.

The apartment renovation from your contractor perspective: check quantities, price the bid, appoint subcontractors and manage the construction sequence.

  1. 01Studio3D design, configuration & site analysis
  2. 02Planning CenterDetailed design & plan exchange
  3. 03AVATender & award
  4. 04Schedule & DeliverySequence & deliver

Apartment renovation from the contractor’s perspective · The same sample tender from quantity check to programme

From tender notice to verified costing.

Discover public contracts, review documents with source references and carry open points into your bid work.

Find contracts

Search TED and German construction notices. Select available public PDFs from DTVP or Vergabe Niedersachsen; check the original version.

Review documents

Analyse PDF and TXT text section by section. Work through scope, deadlines, evidence, risks and bidder questions with document page and quotation.

Organise the work

Pause and resume the review. Manage owners, review status, deadlines, evidence and bidder questions as work lists.

Prepare the bid

Link costing notes with bill-of-quantities items. Check quantities, purchasing and mark-ups; export reports as PDF/Excel and confirmed dates as a calendar file.

The guided contractor costing connects importing the bill of quantities, quantity checks, subcontractors and the client offer. Known open points stay visible.

AI results are suggestions for review. No automatic bid submission, no sending of bidder questions and no quantity take-off from plan images.

Try the matching starting point ↗

Renaldo Studio

Shape the building. Understand the decisions.

Use the provided model to check quantities. Clarify deviations between building elements and the client’s bill of quantities before you submit your bid.

  • Analyse the site and design the building in 3D
  • Compare options and insulation build-ups on each element
  • See the cost impact and walk through the design in Cinema
Explore Studio ↗
Apartment renovation from the contractor’s perspective · building model
Apartment renovation from the contractor’s perspective · building model

Renaldo Planning Center

The model becomes a coordinated design.

Coordinate plans and model versions with the client. The drawing register, versions and approvals keep the basis for delivery traceable.

  • Floor plans, elevations and details from the model
  • IFC import and IFC4 export, surveys and further exchange formats
  • Drawing register with versions, approvals and audit log
Explore Planning Center ↗
Apartment renovation from the contractor’s perspective · quantity check against the provided model
Apartment renovation from the contractor’s perspective · quantity check against the provided model

Renaldo AVA

Planned work items become commissioned work.

Import the client’s bill of quantities and price purchasing and mark-up. Compare subcontractor bids and explain the client offer in the offer room.

  • Import the client’s bill of quantities via GAEB
  • Price purchasing, mark-up and contribution margin
  • Compare subcontractors and carry orders forward
Explore AVA ↗
Apartment renovation from the contractor’s perspective · bid comparison for the sample tender
Apartment renovation from the contractor’s perspective · bid comparison for the sample tender

Renaldo Schedule & Delivery

Orders become a coordinated construction sequence.

Plan trades and floor-by-floor takt from the work items. Time profiles, prerequisites and checkpoints help you prepare the work and follow it on site.

  • Construction schedule with takt and sprint profiles
  • Check prerequisites and preceding work before starting
  • Document site walks, progress and quality
Explore Schedule & Delivery ↗
Apartment renovation from the contractor’s perspective · calculated construction schedule
Apartment renovation from the contractor’s perspective · calculated construction schedule

The site diary.
Takes notes with you.

What happens on site is recorded in seconds. AI turns it into the report for client, owner or site management – you review and approve.

  • Quick capture

    Voice note, photo or text – as quick as a messenger, and offline too.

  • Create a report

    AI summarises the entries into minutes: status per trade, agreements, open items with owner and deadline, and tasks.

  • Dictation, prepared with AI

    A spoken dictation is structured by trade; Renaldo suggests suitable tasks.

  • Site walk with SAM

    On your phone: daily briefing, attendance and findings that you record as a defect or a schedule risk.

Costs stay connected.

A verified quantity deviation becomes a costing decision. Bid, subcontractor packages and construction sequence continue on the same work items.

Approvals and commissioned work are reviewed deliberately. A model change never overwrites completed agreements.

SAM supports your project.

The AI assistant helps with model changes, project questions and site walks. Documents, photos, tasks and team communication form the shared working basis.

Fictitious Hamburg tender and sample bids, not a client order. Features and access depend on role, order and booked scope.

One package.
From tender to construction site.

Bauunternehmen Komplett combines the project modules for costing, procurement and scheduling with the Offers & Orders add-on – contractor costing, the client tender and the 3D offer room. Collaborating is free: external participants and subcontractors work according to their project role without a subscription of their own.

ADD INDIVIDUALLY

Contractor modules

On top of Renaldo Studio, Projekt Komplett or Projekt Komplett Team. The contractor module can only be booked by contractors, general contractors and design-and-build firms; companies & subcontractors are included in Renaldo AVA.

  • Offers & Orders +248 € net / month
    Cost client tenders and present your offer through to acceptance.
View all prices ↗

Without contractor modules: Projekt Komplett €399 net/month for one internal user, Projekt Komplett Team €699 for five.

The concept is included in the module: costing, funding, renovation roadmap and cost summary. Unlock plans: from €290 (renovation) or €490 (new build) including 5 units, then €20 per additional renovation unit or €50 per new-build unit; fully credited later. Move into delivery (tendering, bill-of-quantities export, schedule, quality): project fee from €990 (renovation) or €1,490 (new build), depending on residential units; one shared project fee, independent of the payer’s role. Renovations already covered by Renaldo Bestand Komplett are not charged again. Hotels and partial scopes: individual quote.

Calculate modules and project pricing ↗

Bring costs, schedules and your project team together.

Start in Studio
NEW · SELECTIONS ROOM · 199 € / MONTH

Selections.
Per apartment. By the buyer.

The selections room guides buyers through their fit-out: with a checklist, 3D model, extra-cost offer and, at the end, a concrete product in the bill of quantities. You keep the release and receive requests in order instead of by mail and phone. Selections for your own project stay free in Studio; you need the module for the buyer portal.

RenaldoIllustrative view

Selections · apartment 3.02

12 of 31 points chosenExtra cost so far €4,600
PointChoiceExtraStatus
Living floorOak, oiled+ 3.420 €chosen
Bath tileFormat 60 × 30, matt± 0 €chosen
Front doorModel and colour+ 1.180 €open
SwitchesFrame and colour–due 14 Mar

The buyer chooses in the portal via link, without an account. A choice changes model and cost only after your release.

Design concept · Sample data
  1. 01

    Checklist from the project

    The selection points follow from the chosen services, for example roof, facade, windows, floors, tiles, bathroom and doors. Technical items never show up as a point.

  2. 02

    Buyers choose on the 3D model

    One link per apartment or terraced house, no account needed. Style worlds and fit-out lines set the frame, and the choice shows on the model right away.

  3. 03

    Extra-cost offer and special requests

    Choice and extra price go to the buyer as a fixed-price offer with online acceptance. You review and price special requests and request them as a variation.

  4. 04

    Through to the bill of quantities

    The chosen product appears as “make/type” in the item, in the bill, in GAEB, Excel and PDF. The tender also runs per apartment.

  5. 05

    All apartments at a glance

    Status per apartment, due dates and reminders. SAM advises buyers in the portal so fewer questions reach you.

Per unit with buyer access, a one-off €29 net on top. The module can be booked by property developers, house builders, developers-contractors and general contractors.

The modules you need.
One connected system.

Start with the modules you need and expand when required. Renaldo calculates and generates plans, costs, bills of quantities and schedules from the building model in a few clicks. Review the results and carry them into your work.

01Renaldo Studio

Renaldo Studio

Generate plans and cost calculations from your building model.

  • Building and room models with full IFC handover to your designer
  • Select work items and automatically calculate quantities and cost scenarios
  • Site analysis and feasibility with scenarios, sensitivities, site-check PDF and exposé
  • Energy advice, funding and financing; offers and contracts for building experts
  • Renovation concepts and advisory reports
  • Material article metadata and Excel/CSV library import
  • Planning Center with prepared plan sets and details; exports require project release
Explore features ↗
02Renaldo Planning Center

Renaldo Planning Center

Detailed planning, plan generation and exchange

  • Comes with Renaldo Studio, without a monthly surcharge
  • Plan list with versions, approvals and audit log
  • Sampling: select and approve finishes and materials
  • IFC import and export and other exchange formats
  • Clean plans and exports via “Unlock plans” (project fee stage 2), credited toward the project fee
Explore features ↗
03Renaldo AVA

Renaldo AVA

From the service catalogue to the checked invoice.

  • Automatically generate bills of quantities from checked quantities and selected services
  • Tenders with bid comparison, awards and variations
  • Measurements, invoice checks and approvals
  • Companies and subcontractors included: directory, certificates, history and ratings
Explore features ↗
04Renaldo Schedule & Delivery

Renaldo Schedule & Delivery

Build a programme. Keep work moving.

  • Generate the construction schedule from quantities, durations and stored dependencies
  • Takt planning and 4D simulations
  • Order planning with working-day lead times and schedule markers
  • Site diary, site walks, inspection points and defects
  • Progress and response rules
Explore features ↗
06Offers & Orders

Offers & Orders

Cost client tenders and present your offer through to acceptance.

For construction firms & general contractors

  • Contractor costing: purchasing, sales and margins
  • Client tender: GAEB import, service matching and bid costing
  • Quantity checks, bid schedule and GAEB X84
  • 3D offer room with quantities, schedule and payment plan
  • Protected link, guided tour, online acceptance and read statistics
Explore features ↗
07Selections Room

Selections Room

Buyers choose their fit-out per apartment, with 3D model, extra-cost offer and special requests until acceptance.

For property developers, house builders, developers-contractors & GCs; per unit with buyer access a one-off €29 net on top

  • Buyer portal per apartment with 3D model, no account needed, via link
  • Extra-cost offer with fixed prices and online acceptance
  • Review, price and request special requests as a variation
  • Overview of all apartments, due dates and reminders
  • SAM as adviser in the portal
Explore features ↗

Shared foundation: building data, documents and collaboration connect the modules. Collaboration is not an additional module. Whoever operates a tool pays for the tool (module subscription). The project is paid for once (project fee, covering every participant). Collaborating is free. Invited participants see and work in every booked area according to their project role; paid actions require modules of their own.

AFTER CONSTRUCTION

Keep using project data for technical operations and marketing. Availability follows the respective offer.

Explore technical operations ↗
Compare modules & packages ↗
Features and collaboration in detail

Three things only Renaldo does this way.

The first three are new. They work because every item is backed by a work-item database with market price, effort and duration, linked to the building model. Add everything contractors need day to day, from subcontractors to IFC handover.

Renaldo Studio01

Understand the building.
Down to each apartment.

Explore floors, apartments and rooms in 2D and 3D. A schematic view emerges from the building definition, connected to the room schedule, quantities and costs.

↗

Before an IFC import

Rotate the building, reveal interiors and select floors or apartments. Derived dimensions remain identifiable as assumptions; the schematic view is not a measured floor plan.

↗

Use existing model data

Imported IFC rooms and elements add detail. In the construction schedule, view the sequence on the schematic building or imported geometry.

RenaldoILLUSTRATIVE VIEW
BUILDING / LAYOUT

One building. Connected spaces.

Building A
3 F2 F1 FGF4 floors · 8 apartments
Floors & apartmentsConnected room schedule

Available before an IFC import. Missing geometry remains identifiable as an assumption.

Schematic illustration · fictional sample project
02Cost planning
Renaldo Studio

Understand every cost.

Explore the tools and workflows that support your next project.

↗

Your margin – calculated, not guessed.

Renaldo works every line item back from the selling price: your buying price (own labour or subcontractor) plus your mark-up automatically becomes the selling price for the client. Your margin is always visible – to you. The client sees only the selling price.

↗

Cost, award, build — without a single handover break.

Tender to subcontractors, check bids against your own bill of quantities, and run the construction schedule with everyone involved.

RenaldoWorkspace / Cost planningJL
QUARTIER AM PARK

Cost planning

↗
Project budget12,80 Mio. €
Forecast12,46 Mio. €€340,000 below budget
Committed To award
Structure4.180.000 €
Envelope2.340.000 €
Services3.120.000 €
Fit-out2.820.000 €
✓ Building quantities · Prices by work item
RENALDO · DESIGN CONCEPT · SAMPLE DATA
Features and workflows in detail 5 topics +

Plan & cost

Capture the works (dictation included) and cost them with a hidden margin – buying price, mark-up, selling price per trade.

2

Buying price → mark-up → selling price: your margin, costed out of sight.

For every line item you record the buying price (own labour or subcontractor) and your mark-up – Renaldo works out the selling price automatically. The costing overview shows buying price, selling price, margin and contribution per trade and for the project as a whole. The client sees none of it except the selling price.

  • Hidden margin per line item – buying price, mark-up and selling price kept cleanly apart
  • Standard mark-up as the company default, overridable per line item
  • Margin & contribution per trade and overall at a glance
Hidden margin Contribution Mark-up override
2

Capture the works – by dictation if you like.

Take down the job: enter the address, record the building data and configure works from more than 20 trades – with quantities from the building model. Or simply speak the works: dictated capture turns your spoken measure-up straight into line items in the costing.

  • Works configuration across 20+ trades, quantities from the model
  • Dictated capture – speech straight to line items
  • Add your own line items freely – works for pure interior fit-out too
Dictation SAM 20+ trades

The client's works contract – in minutes, awarded online.

Your costing becomes the works contract for the client: a white-label PDF with your logo, a bill of quantities at selling prices (gross), works-contract clauses, a payment schedule and appendices. Sent by email link – the client views and awards online by QR code, without logging in. Sending locks an unchangeable version, and you can see the status per quote.

  • White-label PDF with works-contract clauses & payment schedule
  • Bill of quantities at selling prices – never buying prices or margin
  • Online award by QR link, status per quote
Works contract White-label Online award

Exports: PDF, white-label & CSV

White-label PDFs with your logo and CSV exports – slots into the billing workflow you already have.

Start with your own building and an initial cost estimate.

Start in Studio
03IFC handover & further designRenaldo Studio

Your designer starts with a model.

A prepared starting point reduces repeated data entry, especially in renovation. RENALDO generates draft drawings from the building model and room schedule at the click of a button. Your designer receives the model via IFC, reviews it and develops the architectural design and subsequent planning.

  1. Start with the existing building

    Available LOD2 building data and a hypothetical room schedule provide an initial model. Existing drawings, surveys, scans or IFC data refine that starting point.

  2. Hand over the full model

    IFC4 export includes the components present in the model: walls, slabs, roof, stairs, windows and doors, plus spaces, quantities, materials and properties. Draft drawings from the Planning Center support the handover.

  3. Review and develop the design

    The designer checks dimensions and existing conditions, adds a measured survey where needed and makes the final architectural adjustments. Professional planning builds on the early design.

LOD2 and a hypothetical room schedule are early design assumptions, not a measured survey. Spaces without a known location remain records without invented geometry. The designer checks import and editability in the chosen CAD system and remains responsible for professional review and approval.

Module: Renaldo Planning Center, included in Studio packages. File handover follows the project release rules for plans and data exports; a trial alone does not unlock IFC downloads. Portfolio-package and homeowner project and package rules apply.

04RENALDO Planning CenterRenaldo Planning Center

Start planning from a prepared building model.

Generate draft plans and preliminary calculations automatically from your building model as a shared starting point. Review assumptions with specialists and reuse checked quantities and selected work items for costs, procurement and scheduling.

RENALDO PLANNING CENTERIllustrative view
Building model

Rooms · Components · Quantities · Assumptions

Plans & preliminary sizingReview & refineCosts · BoQ · Schedule
A shared starting point. Professional review turns prepared values into your project baseline.
05Subcontractor management
Renaldo AVA

Invite subcontractors.
Compare against your bid.

Every title of the tender becomes a subcontract package. Subcontractors price exactly the client’s items in the portal or download them as GAEB X83. The bid comparison shows what you keep, per item number.

RenaldoIllustrative view

Bid comparison · package 01.02 facade

3 subcontractors invited2 offers received
ItemYour bidSub ASub BMargin
01.02.02.001048.330 €39.420 €41.040 €8.910 €
01.02.02.00306.480 €5.616 €5.184 €1.296 €
01.02.02.00405.760 €4.848 €5.088 €912 €
Your bid to the client60.570 €
Margin in this package11.118 €

Award with the package specification attached. Inviting bids carries no project fee – it is due with the first award.

Design concept · Sample data
  1. 01

    Packages from the client’s bill

    Find suppliers, send invitations with preview, collect offers – with the tender’s item numbers, short and long texts. Requires bid costing and Tender & Bill, both included in Bauunternehmen Komplett.

  2. 02

    Margin per item

    The comparison sets subcontractor offers against your bid to the client – per item number and as a package total. The benchmark exists before the first subcontractor bid: costed from the Renaldo market price, real contractor prices with a regional factor.

  3. 03

    Award and keep building

    The award stores the package specification as the contract basis. Schedule, variations and invoice checks continue in the same project.

  4. 04

    All subcontractors in one place

    Every company from your projects with required certificates and expiry reminders, a company check via North Data and insolvency notices, figures such as award rate, variation rate and schedule reliability, and ratings after acceptance. Favourites and the block list apply to the whole organisation. This part belongs to Renaldo AVA, so it is also available without Bauunternehmen Komplett – for consultants, developers and housing companies; included in Renaldo Bestand Komplett.

06Tendering & award
Renaldo AVA

Compare with confidence.

Explore the tools and workflows that support your next project.

↗

The bid comparison that shows the gaps too

Every bid measured against your own bill of quantities.

↗

Tender, check bids, feed prices back item by item.

Tender individual trades or line items to your subcontractors – online, without the WhatsApp chaos. Bids arrive in the portal and AI bid checking compares them item by item. When you award, the subcontractor's price flows back into your costing item by item as the buying price – and your selling price recalculates automatically with your mark-up. Prefer to upload a PDF? The AI reads the line items out of it.

RenaldoWorkspace / Bid comparisonJL
QUARTIER AM PARK

Bid comparison

↗
Windows & doors3 bids
NordbauHansenElbwerkBid84.200 €79.600 €87.100 €Items24 / 2422 / 2424 / 24Installation✓✓✓Sealing✓—✓
! 2 items missing. Clarify before awarding.
Prepare award ↗
RENALDO · DESIGN CONCEPT · SAMPLE DATA
Features and workflows in detail 5 topics +

The bid comparison that shows the gaps too

The bids line up next to each other, item by item. What becomes visible is not only who is cheaper — but what the cheapest bid leaves out, and how much money that leaves open.

Tender, check bids, feed prices back item by item.

  • Request from subcontractors online & award in the portal
  • AI bid checking & comparison, item by item
  • Item-level price feedback as the buying price – selling price recalculates automatically
Price feedback AI bid checking PDF upload

The bill of quantities you never have to write

Straight from the configuration into the tender.

Your configuration becomes a tender-ready bill of quantities across every trade — with long descriptions, quantities and unit prices. From there straight into the local search and the online request.

Your subcontractor network – across every project.

The subcontractors who have proven themselves sit in one central place, Companies & Subcontractors – not scattered across your contacts: the directory of all firms from your projects, with required documents and expiry reminders, company checks, history and performance figures. Rate every engagement in three categories (communication, quality, price fairness), with history and average. For each trade Renaldo suggests your best suppliers; with auto-inclusion they land in matching tenders automatically. Bad experiences go on the block list.

  • Three-category rating with history & average
  • Auto-inclusion of matching suppliers per trade
  • Block list for “don't ask again”
Ratings Auto-inclusion Across projects

AI invoice checking

Check subcontractor invoices automatically against the bill of quantities and the award – discrepancies visible immediately.

From offer to commissioned scope

Attach the construction contract

Professional clients choose a BGB or VOB/B template, review prefilled project data and add agreements. The specification and schedule can be attached.

Acceptance in the order portal

The contractor reads and downloads the contract in the portal and explicitly accepts it. Contract status and the acceptance record stay with the order.

Generate your next tender from quantities and selected work items.

Start in Studio
07Change orders
Renaldo AVA

Understand changes.
Commission with clarity.

What changed since the contract was awarded? Renaldo connects items, quantities and the contractor’s offer to your decision. Open proposals and approved additional costs remain separate.

RenaldoIllustrative view

Changes against the awarded scope

NT 02 · ElectricalOffer received
Quantity changedSockets12 → 18
NewData connection4
RemovedWall light2 → 0
Proposed additional cost1.480 €
Additional duration2 days

Not yet commissioned. Only approval increases the order value.

Design concept · Sample data

Keep the agreed baseline

The awarded specification stays with the order as a snapshot. Select new, removed or changed items individually for a variation.

Agree with the contractor

Contractors price requested variations in the portal or submit items and lump sums themselves. When importing a PDF offer, Renaldo flags overlap with awarded work for review as additional quantity or duplicate billing.

Approve and update the schedule

Approval commissions the variation and requires a price. Only approved variations increase the order value. Additional time can be added as a separate schedule task, which also contributes to the progress comparison.

08Invoicing & approval
Renaldo AVA

Review first.
Then approve.

Does billing match construction progress? Renaldo connects orders, variations, progress and invoices to highlight overpayment risks before approval.

The decision remains yours. Warnings do not block payment.

RenaldoIllustrative view
PROJECT MANAGEMENT

Billing & approval

ElectricalOverpayment risk
Order incl. approved variations100.000 €
Construction progress 20 %
Billing progress 70 %

50 percentage points ahead: billing is substantially ahead of construction.

Approved, not yet paid30.000 €
Invoices recorded as paid40.000 €

Construction progress from status updates, weighted by working days. No automatic payment.

Design concept · Sample data
01

Establish the order basis

The accepted order plus approved variations form the order value. Invoices are linked to orders; you resolve ambiguous cases.

02

Review before approval

Open defects, payment-related checkpoints and overruns are highlighted, as are final invoices before acceptance and variation invoices without an approved variation. Approval despite warnings requires a reason. Approval and recording payments require a separate permission.

03

Track payments

Record payment dates, discounts and retention. Discount and due-date reminders support processing. Transfers are still made through your bank.

04

Request payment

Ask homeowners in the project team to pay after approval and send reminders when needed. The last dispatch remains visible. Saved invoices can also be analysed with SAM later.

● Within range● Monitor● Overpayment risk● Missing basis

The traffic light compares billing with reported construction progress, not workmanship quality. Completion reports without acceptance are shown separately. Grey means the order or construction schedule is missing.

See what Renaldo can do for your own project.

Start in Studio
09Schedule & 4D
Renaldo Schedule & Delivery

See your construction sequence.
Inside the building.

Generate the schedule from work items. Explore takt alternatives to shape the sequence and see saved dates mapped to floors, apartments and rooms in the 4D view.

↗

From bars to the building

Select a date, play the sequence and isolate trades. Switch between the schematic view and imported IFC geometry. Unresolved mappings remain visible.

↗

Plan, inspect and adjust daily

Compare takt alternatives, follow task-linked checkpoints and record readiness and progress during site walks. 4D colours represent the plan; site reports document actual progress.

RenaldoILLUSTRATIVE VIEW
SCHEDULE / 4D

See the sequence unfold.

Building A
3 F2 F1 FGF4 floors · 8 apartments
Finished in planActive in planLater

Sample fit-out trade. Colours show planned dates, not confirmed completion.

Schematic illustration · fictional sample project
Features and workflows in detail 3 topics +

The construction schedule that writes itself

And everyone involved keeps it current.

The durations come from the same configuration as the costs. If one task slips, the whole plan follows. Firms report from the portal — via link, no account.

Construction schedule

Phases, tasks and milestones across every trade – the planned/actual check shows “on plan” or “overdue”.

Defects & handover

Record defects with photo and location, work through inspection points per trade, and document handover defensibly.

Give documentation a location

Defects and checks on the plan

Place a defect, checkpoint or diary entry on a PDF plan. Each pin belongs to a particular plan version and page and opens its linked record.

Keep meetings traceable

Record participants and outcomes in the site diary, send minutes as PDF to participants and look up recorded project events in the event log.

10Material library & order planningRenaldo Schedule & Delivery

From material item to timely ordering.

Reuse your article library

Maintain article number, manufacturer, supplier, unit and price for materials. Import Excel and CSV lists into your library with column mapping and preview. Material data stays connected to line items and work preparation.

Include lead times in the schedule

Set lead times in working days for materials, line items, trades and company defaults. Order planning shows sampling, release and latest ordering dates before installation. Changes to source data flag existing orders for review.

Renaldo Studio covers material items and library import; Renaldo Schedule & Delivery covers order planning. Companies & subcontractors are included in Renaldo AVA. Bauunternehmen Komplett adds the Offers & Orders contractor module with contractor costing and the 3D offer room. Packages from the client tender require the contractor module and Renaldo AVA.

11Bid costing
Offers & Orders

Tender in.
Bid out.

Import the client’s GAEB tender, match every item to a Renaldo service and cost it with market prices, mark-up and contribution margin. Your bid goes back as GAEB X84 – in exactly the structure of the tender.

RenaldoIllustrative view

Client tender

X83 · 248 items96 % matched
ItemShort textQtyRateMargin
01.02.02.0010ETICS mineral wool 160 mm540 m²89,50 €18 %
01.02.02.0040External window sill48 St120,00 €21 %
02.01.01.0020Air-to-water heat pump1 psch28.500 €14 %
Bid total, net81.630 €
Contribution margin16,4 %

Bid as GAEB X84 – the same item numbers as the tender, including VAT and gross total.

Design concept · Sample data
  1. 01

    Import the tender

    GAEB DA XML 3.1 to 3.3 (X83, X81) with all titles, provisional, alternative, lump-sum and daywork items. Search by item number or text.

  2. 02

    Match and cost

    AI suggests a Renaldo service for every item, you confirm it. Confirmed matches are remembered for the next tender. Market price with regional factor as cost suggestion, mark-up per item or for the whole bill.

  3. 03

    Check before you bid

    Quantities against the building model, missing scope as a hint for a bidder question – and a bid schedule with takt planning from the tender quantities.

  4. 04

    Submit the bid

    GAEB X84 with the same IDs and item numbers, totals per title, VAT and gross total. The client’s tendering software reads it directly.

Start with your own building and an initial cost estimate.

Start in Studio
123D offer room
Offers & Orders

An offer
you can walk into.

Instead of a PDF attachment, a protected link: your client sees their building in 3D, taps the roof, facade or heat pump and sees the related items, the schedule and the payment plan. A guided tour explains the offer step by step – and the order is placed online.

RenaldoIllustrative view

Your offer · Sample Street 12

Overview3D modelScopeSchedulePaymentsAccept
Facade · 14 items
  • Roof
  • Facade
  • Heat pump
  • Photovoltaics
Offer total, gross97.140 €
Durationabout 5 months

First opened on 2 Oct · scope 3× · schedule 2× – without IP address or device data.

Design concept · Sample data
  1. 01

    Explained on the model

    Highlight components in the 3D model and show their items. For tenders in the client’s structure, with item numbers.

  2. 02

    Schedule and payment plan

    Takt-based bar chart from the quantities and instalments by construction progress. Link and PDF show the same version; a new version retires the old link.

  3. 03

    Accept online

    Your client accepts the offer in the room. You see when it was opened and which sections were read. Purchase prices and margins never appear.

13Documents & decisions
Collaboration · free for all

Keep decisions with the project.

Explore the tools and workflows that support your next project.

↗

Photo gallery & document storage

Site photos by trade and phase plus drawings, certificates and contracts – audit-proof, in one place per project.

RenaldoWorkspace / Documents & approvalsJL
QUARTIER AM PARK

Documents & approvals

↗
All documentsFor approval · 2
↗
Window bidPDF · 2,4 MB
In review
↗
Bill of quantitiesPDF · 840 KB
Approved
↗
Handover Building APDF · 1,2 MB
Draft
Versions and decisions stay with the project.
RENALDO · DESIGN CONCEPT · SAMPLE DATA

See what Renaldo can do for your own project.

Start in Studio
14Project overview
Collaboration · free for all

See the whole picture.

Explore the tools and workflows that support your next project.

↗

Next step

↗

The problem: your margin lives in your head – and one change request upends it.

“I collect subcontractor prices by phone, email and WhatsApp – there's no overview.”
RenaldoWorkspace / Portfolio cockpitJL
PORTFOLIO STRATEGY

Portfolio cockpit

↗
Projects12
Homes248
Budget38,6 Mio. €
Park QuarterNew build · 48 homes
78%
Parkstraße 12Renovation · 64 homes
42%
Am LindenhofInfill · 24 homes
25%
✓ Costs and schedules. Project by project.
RENALDO · DESIGN CONCEPT · SAMPLE DATA
Features and workflows in detail 5 topics +

Next step

✓ Every feature for 60 days – no credit card. Plans carry a watermark during the trial.

Built by practitioners: 10 years of retrofit project management plus 30+ years of construction expertise.

The problem: your margin lives in your head – and one change request upends it.

“I work out the mark-up in my head. Whether there's really any margin left at the end? Gut feeling.”
“Building a client quote in Word costs me half a day – and it still doesn't look like a contract.”
“If the client changes one small thing, I have to re-request every subcontractor and retype the lot.”

That is exactly what Renaldo for construction firms is for.

SAM – AI assistant

Technical questions on trades, building physics and standards – SAM answers in expert terms, in the context of your project.

Task flow

The main-contractor task flow walks you through step by step: building data, works, costing, works contract – nothing forgotten.

GDPR & German servers

Servers and database in Germany, files in the EU. Project and customer data exportable or deletable at any time.

Questions?
Let’s get specific.

Can my client see my buying prices or my margin?+
No. Renaldo keeps them cleanly apart: internally you cost with a buying price and a mark-up – the client sees only the selling price. Buying prices, which subcontractor a price came from, and your margin always stay internal.
I only do interior fit-out – is it still worth it?+
Yes. You can use Renaldo purely to produce a clean quote or works contract for the client, without the full design process. The complete tendering and site-management side is there when you need it.
How does tendering to my subcontractors work?+
You tender individual trades or line items to your subcontractors. Their prices flow back into your costing item by item as the buying price – and the bid automatically becomes your selling price with your mark-up applied.
What happens when the client asks for a change?+
The affected line items are flagged automatically as “needs re-quoting”. One click sends a tightly scoped re-request to only the subcontractors concerned, and produces a new quote version with a delta view – without rebuilding everything.
Can I import my client’s GAEB tender?+
Yes. Renaldo reads GAEB DA XML 3.1 to 3.3 (X83, X81) with all titles and item types, matches every item to a Renaldo service and returns your bid as GAEB X84 in the same structure – with the same item numbers, totals per title, VAT and gross total.
What is the 3D offer room?+
Your offer as a protected link: the client sees their building in 3D, the items on each component, the schedule and payment plan, takes a guided tour and accepts online. You see when it was opened and which sections were read – without IP addresses. Purchase prices and margins never appear.
When is the project fee due?+
Inviting subcontractors for packages from the client’s tender is free of the project fee – you are still working on your bid. The project fee is due with the first award to a subcontractor.
What does Renaldo for contractors cost?+
Bauunternehmen Komplett is €599 net per month for one internal user: Renaldo Studio, Renaldo AVA with companies & subcontractors, Renaldo Schedule & Delivery plus the Offers & Orders contractor module with contractor costing, bid costing and the 3D offer room. Offers & Orders includes bid costing and the 3D offer room for €248 per month on top of Studio. Subcontractor management is included in AVA. The Planning Center is included; plans and exports require a project release. You get a 60-day free trial with the full feature set – no credit card. All the details on the pricing page.

Planned in the office.
With you on site.

Renaldo goes where your project takes you. With the iOS and Android app, project information is at hand for site managers, building experts and trades.

Start the contractor demo ↗
One project view. Wherever you are.
9:41 ▥ ▰
RENALDO CREW

Good morning, Tim.

TODAY · BUILDING AInstall windows

08:00 — 16:00 · 2. OG

68 %
+ Report progress
Add photo ↗
UP NEXTCheck connectionsTomorrow · Building A · 09:00
☑Tasks▧Photos⌂Project
Illustrative view · Site portal

Your next project.
With a clear plan.

Your next step, explained.

  1. Without an account

    Explore the journey from model to costing and construction. No sign-in needed.

  2. Test with an account

    Take your draft into the trial and test modules with your team. Trial PDFs carry a watermark.

  3. Choose when ready

    Continue with one free project or choose a package. Clean plans and data exports require a separately purchased project unlock.

Package and project fees only apply when you explicitly order them. View prices and scope ↗